List revisit, to do.

Here is my list from a few weeks ago revisited.

things I need to learn exactly what their status is

  • Head/shower- Holding tank on order for complete re plumbing of black water.  Shower fully functional after replacing fresh water pressure pump
  • Holding tank-9 gallons of useless treatment system, to be pulled out
  • Diesel tank- 10 gallons of old diesel and most likely tree growth in a 20 gallon tank.
  • Basic wiring- crap, interior lights, -dc bus, ac charger all rewired, all other systems need overhaul still
  • Thru hulls- mostly good, 1 needs a new valve and another may need complete replacement.

things I know need work

  • Deck paint(nonskid)-Kiwi Grip ordered, yet to arrive, other paint and primer on hand
  • Hull paint (anti faul)- pending
  • VHF antenna and radio (AIS)- VHF radio purchased, still to be purchased , AIS reciever and 2 VHF antennas w cables
  • Wind vane (masthead)- To be purchased Shakespeare whip with wind vane
  • Compass-Replaced with Plastimo, pretty cool as you can read it from in the galley/cabin
  • Anemometer- Going to scrap and do without, may get a handheld.
  • Vents- Topside vent to be removed, aft bulkhead to be left in place, forward hatch to be replaced with solar vent (already purchased)
  • Solar panel- 50watt already purchased but not yet installed
  • Automatic bilge n buzzer- temp bilge pump in place with parts for permanent on hand, just have to spend the time.   Still thinking about the buzzer.
  • Rigging(standing and running)- Mast unstepped, obtaining price quotes for new spreader, will have boat re-rigged.
  • Mainsail cover- purchased temp replacement that does not fit that well but is better than what we had will get proper cover when we replace the main
  • Spreader and running lights- All need replacement and rewire
  • Interior lights-All fixtures rewired with proper marine cable and 2 fixtures replaced with new. LED bulbs replacements ordered for all interior lights.
  • Motor-Westerbeke W13 in garage needing assembly with Hurth transmission,  waiting for price quote on electric conversion but most likely to do W13
  • Renaming- Still to be done
  • Removal of outboard- Will be done to allow patching and painting of transom
  • Hot water tank- Thinking about it, have to figure out location for it so may not happen due to space concerns
  • Window blinds- All purchased, 50% installed

New additions to this List

 

  • Top hatches rebed and new lenses
  • Starboard rear cleat need re-bed and larger backing plate
  • Re-bed starboard jib track and some hardware to stop leaks
  • Remove bow pulpit and re-weld starboard aft plate that is broken
  • Reseal window frames (Starboard side)
  • Repaint mast and boom
  • Repair all hinges
  • Replace plywood doors with acrylic and add piano hinges
  • Repaint Freeboard
  • Add fresh water foot pump and spigot to galley
  • Add valve to select fresh water feed tank so we are more aware of usage
  • Make new set of dock lines
  • Weave eye onto anchor rode
  • Install pad eye in chain locker
  • Install larger bow roller (already purchased for Clew but never installed)
  • Install speaker in cockpit

 

Well that is it for now, time for bed…

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s